Short Profile

50 Years of Experience

Swissgas has provided safe, reliable and cost-effective network operation and maintenance services for over 5 decades, along with the associated transport activities and various services.

ERI

Building applications

Third-party building applications are now submitted directly to the Swiss Federal Pipeline Inspectorate (Eidgenössisches Rohrleitungsinspektorat, ERI).

Annual report 2022 (German version)

High pressure transport network

Grid map

To total length of the high pressure gas grid is 260 kilometres; it has 12 entry points along the border.